Paolo Pezzotta Has Submitted a New, Market-Financeable Design for Route 422, Corridor-Mobility Development in Southeastern Pennsylvania

Reading, PA/King of Prussia, PA
September, 2011
ITP, Inc. has just completed a multi-dimensioned program of mobility improvements and broader, enterprise, income-generation-capabilities to support expanded mobility and economic development for the corridor. The toll plan component of ITP’s plan does not require the tolling of the general purpose lanes, which is a major difference with the DVRPC strategy. ITP’s plan outperforms the present plan financially, econmically, environmentally and operationally at reduced cost and reduced risk.

The plan is now being evaluated by various leaders within the corridor business and community leaders as well as government-agency participants

About admin

This is my biographical info. Praesent at quam dolor. Vivamus convallis velit vel augue congue vehicula. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Aliquam non nulla a urna vulputate molestie sed id odio. Fusce ullamcorper elementum metus sed imperdiet. In adipiscing arcu vitae leo aliquet dignissim. Mauris sit amet ultricies quam. Phasellus sagittis mi lorem. Etiam enim nibh, adipiscing ac aliquam sit amet, pharetra nec tortor.
This entry was posted in Uncategorized. Bookmark the permalink.

Comments are closed.